September's addition and remodeling progress...

It's been a very productive month, about which we couldn't be more pleased and excited. If you need a refresher of where we last left our heroes, you can skim through the pictures in the September 5 update.

People kept asking us how many square feet we were adding on, and we finally got tired of answering, "We don't know," so we contacted the architects who informed us that we're going from 1000 square feet to 1,500 square feet.
Hooray!

The executive summary of this month's progress is:

  • Framing of new areas (porch, master bathroom, master bedroom closet, storage areas) completed

  • Water heater moved

  • Existing kitchen demolished

  • New plumbing roughed in

  • New electrical wiring roughed in

September 2, 2016 — Screened-in porch framing
Porch framing


September 4, 2016 — Kitchen, master bathroom, and master bedroom framing
Kitchen, master bathroom, master bedroom framing


September 6, 2016 — Porch roof framing
Porch framing


September 8, 2016 — Porch roof
Porch roofing


September 15, 2016 — Skylights / solar tubes arrive
Skylights and solar tubes


September 16, 2016 — Kitchen and master bathroom skylights
Kitchen and master bathroom skylights


September 16, 2016 — New roof over back storage shed, porch, and master bedroom
(as seen from our neighbor's yard)
New roof and side view from neighboring yard


September 17, 2016 — Fridge and microwave moved into the living room
in advance of the kitchen demolition

Fridge and microwave now in living room


September 17, 2016 — Bob removed cabinets, counters, and the stove!
Stove, cupboards, and counters gone


September 17, 2016 — Bob also removed the island that was in the kitchen!
Kitchen island gone


September 19, 2016 — Kitchen back wall, sink, window, and cabinets demolished
Gutted kitchen


September 19, 2016 — View from old kitchen opening into
new galley kitchen area replacing it

Kitchen sink, window, and wall gone


September 19, 2016 — Diana and Rollo at work
Dianna and Rolo working


September 26, 2016 — View from existing TV room into new master suite
(hallway in middle, closet to the right, master bathroom to the left, bedroom in the back)
View into new master suite


September 26, 2016 — New storage area in the hallway
that leads to existing bathroom

New hallway storage area


September 29, 2016 — Back of house (master bedroom, porch, and shed) walled and roofed
Back view of master suite, porch, and storage shed


September 30, 2016 — Exhaust fan and canned lighting in new master bathroom
Canned lighting


September 30, 2016 — Electrical work roughed in
Electrical wiring rough-in


September 30, 2016 — Plumbing work roughed in
Washer and dryer plumbing


September 30, 2016 — New air intake facing the master suite hallway
Air intake


Coming soon: Insulation, sheetrock, floors, and cabinets...
Tags: remodeling and addition
Subscribe

  • Post a new comment

    Error

    default userpic

    Your reply will be screened

    Your IP address will be recorded 

    When you submit the form an invisible reCAPTCHA check will be performed.
    You must follow the Privacy Policy and Google Terms of use.
  • 0 comments